PORTOFOLIU private

Environmental and Social Impact Assessment (ESIA) Services under the project "Geothermal Hot Dry Rock, Timișoara - Environmental and Social Impact Assessment Study"
Services:
- preliminary assessment to identify potential environmental and social impacts;
- identifying and map the relevant stakeholders;
- assess and analyze the impact of this project;
- developing an environmental and social impact management plan and comply with relevant national, regional and international legislation, regulations and standards.

Water Bodies Impact Assessment Study within the project “TRANSREGIO Road Feleac TR35 – Stage I – Metropolitan Ring Road”
(Project: “TRANSREGIO Road Feleac TR35 – Stage I – Metropolitan Ring Road”)
Services:
- Preparation of the technical documentation and its submission;
- Technical consultancy and facilitation of dialogue with the water management regulatory authorities, as well as with other relevant institutions, in order to obtain approval of the study, representation of the documentation in the review process.
EPMC Consulting provided specialized services for the preparation of the Water Bodies Impact Assessment Study (WBIAS / SEICA), in accordance with the provisions of Order no. 828/2019 regarding the issuance, amendment and withdrawal of the Water Management Permit, including the procedure for assessing the impact on water bodies.

Preparation of the funding application and the funding file for the Research Laboratory on Personalized Therapy in Oncology
Services: Preparation of the funding application and the funding file for the Research Laboratory on Personalized Therapy in Oncology, ID 487, SMIS code 103392, project financed by the Operational Program Competitiveness 2014-2020 – Action 1.1.1., Large Research and Development Infrastructures.

Services for the development of studies related to habitats and species of community interest in the Fagaras Mountains and the Fagaras Piedmont
Services: Consulting provided consultancy for the implementation of the Project. The project aimed at the development of biodiversity studies related to forest habitats of community interest ROSCI0122 Fagaras Mountains, within a project financed by the POS Environment program 2007-2013, Axis 4.

Monitoring the conservation status of fish species in Romania
Services:
- Preparation of monitoring plans and supporting documentation for fish species of community interest;
- Monitoring the conservation status of community fish species in Romania;
- Publishing and disseminating monitoring guides for species and habitats and the monitoring method adapted to the situation in Romania, in view of the following reports to the European Commission;
- Designing the single monitoring framework and validating SIMSHAB information system data by the Project Coordination Committee (CCP);
- Preparation of supporting documentation regarding the monitoring of the conservation status of species and habitats of community interest, in view of reporting by the competent authority to the European Commission based on Article 17 of the Habitats Directive 92/43 EEC.

Crișuri Management Plans
Services: Setting up of management plans for the sites ROSCI0049 Crișul Negru, ROSCI0050 Crișul Repede upstream of Oradea and ROSPA0123 Accumulation lakes on Crișul Repede, ROSCI0061 Defileul Crișului Negru, ROSCI0104 Lunca Inferioară a Crișul Repede, ROSCI0068 Diosig and ROSCI0262 Valea Iadei.

Funding application preparation – Zlatna Park
Services:
- Identification of financing opportunities and verification of eligibility conditions;
- Project development and preparation of the financing forms;
- Submission of the financing forms;
- Assistance during the project evaluation period;
- Assistance in contracting

Financing application for Hydropower Development on the Vad River, Sibiu County
Services:
- Preparation of a financing application for: €2,153,000;
- Hydropower development on the Vad River, Boiţa Commune, Sibiu County;
- Identification of financing opportunities and verification of eligibility conditions;
- Project development and preparation of the financing file;
- Submission of the financing file;
- Assistance during the project evaluation period;
- Assistance in contracting.

Preparation of a grant application for a Biomass Plant in Radauti, Romania - Thermal energy production plant by burning biomass with a thermal capacity of 40.5 MWh
Services:
- Identification of financing opportunities and verification of eligibility conditions;
- Project development and preparation of the financing file;
- Submission of the financing file;
- Assistance during the project evaluation period;
- Assistance in contracting.

Subsequent documentation review services for the project AUTHORIZATION OF THE GIURGIU 45MWp PHOTOVOLTAIC POWER PLANT, opinions, green certificate evaluation and geotechnical studies, according to contract no. 79444P01/19.03.2013
Services:
- Review of the documentation, with emphasis on the authorization procedure required for the construction and grid connection of a photovoltaic power plant in Romania, the minimum requirement including: the construction authorization and environmental authorizations, as well as the assessment of eligibility for green certificates;
- Analysis of the existence of missing or non-compliant information or documents with the other documentation, in order to meet the requirements of the applicable Romanian legislation;
- Verification of the coherence of the impact reduction measures proposed within the Environmental Impact Assessment;
- Development of a table with critical elements, including missing or expired authorizations, if applicable;
- Participating in the development of a technical due diligence report (TDD), together with Fichtner GmbH & Co. KG and Fichtner Engineering S.A., as well as providing expertise on any specific aspect of Romanian legislation or practice that may arise during the project;
- Checking documents regarding geotechnical risks, flood risks or other risks that must be taken into account when carrying out the project and developing a chapter in the TDD report describing the geotechnical situation.

Due Diligence Services – analysis of regulatory documents of three private photovoltaic park-type objectives, according to contract no. 32/23.11.2012
Services: analysis of regulatory documents issued by the authorities for the construction of 3 photovoltaic parks, partial preparation of Due Diligence reports and conducting site visits.

Consulting services for subsequent activities to obtain permits and geotechnical studies, according to contract no. 7730P01/02.07.2012
Services:
- Review of the documentation, with emphasis on the authorization procedure required for the construction and grid connection of a photovoltaic power plant in Romania (Giurgiu): construction authorization and environmental authorization, as well as the assessment of eligibility for green certificates;
- Analysis of the existence of any missing or non-compliant information and documents with the other documentation, in order to meet the requirements of the applicable national legislation;
- Verification of the coherence of the impact reduction measures proposed within the Environmental Impact Assessment;
- Reviewing of critical elements, including missing or expired authorizations, if applicable;
- Participation in the development of a technical due diligence report (TDD), together with Fichtner GmbH & Co. KG and Fichtner Engineering S.A., as well as providing expertise on any specific aspect of Romanian legislation or practice that may arise during the project;
- Verification of documents relating to geotechnical risks, flood risks or other risks to be assessed for the implementation of the project and drafting the chapter in the TDD report on the geotechnical situation.

Specialized consultancy in the field of environmental protection for the implementation of the project "Development of the tourist area - Nedeia ski area, Țarcu Mountains"
Services: consulting services in project implementation; the contract aims to develop the environmental studies necessary to obtain regulatory acts in the field of environmental protection (Environmental Approval at the stage of establishing the land utilization, respectively at the PUZ stage and Environmental Agreement at the stage of obtaining the Building Permit, the PAC stage) for the largest and most modern ski area ever designed in Romania.